Tag Archives: cawston greenway

Sunny But Cold Workday

John, Mick and myself today and we pushed on southwards. John worked on the bank and Mick used the brush-cutter down in the Bird-box clearing. Looking back towards the bridge. This area is going to be so hot in the … Continue reading

Posted in Newsreel | Tagged , , , , , , , , , , , , | Leave a comment

Weekend Workday

Great weekender today. Mick, Aaron, Chris, Tim, Jude and myself all mucked in and managed to clear a good section on the south side of the bridge. A rare picture of me, tending the fire. Mick and me brush-cut a … Continue reading

Posted in Newsreel | Tagged , , , , , | Leave a comment

Us Four v. Storm Imogen

Well what a workday!! John, Aaron, Mick and myself battled against Storm Imogen to get the job done. And boy, did we get that job done! This is the south side of the bridge, you can see that we are … Continue reading

Posted in Newsreel | Tagged , , , , , , , , , , | Leave a comment

Log Piles and Dead Hedges

Today Mick, John and myself made it. We decided to not burn everything and instead, build a few piles of logs and brash, and also add to the hedging at the top of the clearing. We burnt off the really … Continue reading

Posted in Newsreel | Tagged , , , , , , , , , , , | Leave a comment

Three Men, Two Fires, Lots Cleared.

John, Aaron and me today and we started to clear all the brash from last week. It just seemed like endless toil, but we got two fires going and piled them high. There is still a little bit left to … Continue reading

Posted in Newsreel | Tagged , , , , , , , , , , , | 2 Comments

Now that is a clearing!!

Lovely workday today with Aaron, John, Mick and myself getting stuck in. We cleared back the Picnic Clearing northwards until we were out of the cutting and on flat ground. You can see how wide we have made the path. … Continue reading

Posted in Newsreel | Tagged , , , , , , , , , , , , | Leave a comment

New Path

We have talked about it for so long and I think the total mud-bath that the path has become forced our hand somewhat. We brush-cut a new path on the slightly higher ridge of ballast that runs alongside the old … Continue reading

Posted in Newsreel | Tagged , , , , , , , , , , , , | Leave a comment

Weekender

Brilliant turnout today with about twelve of us meeting up in the Picnic Cutting to burn off the piles of brash, that we had stored under the bridge to dry it out. I got the fire going very quickly and … Continue reading

Posted in Newsreel | Tagged , , , , , , , , , , , , , | Leave a comment

Late Update – sorry!

The last two greenway workdays are rolled into this one blog entry. We have been working in the Picnic Clearing and have just about finished it on the Rugby side of the bridge. This is Aaron cutting back a load … Continue reading

Posted in Newsreel | Tagged , , , , , , , , , , , , , | Leave a comment

Damp Day

Aaron, Mick, John and myself today. Everything was very wet from all the rain over the last week so I eventually abandoned the fire. I dragged all the brash under the bridge so it can dry out and we can … Continue reading

Posted in Newsreel | Tagged , , , , , , , | Leave a comment