Six or so of us turned out today in very soggy weather. We pushed on down with the path widening.
We are so close to getting to the end, just in time too. The path widening will make a huge difference in summer.
No workday next Sunday but midweekers in the following week. Tue 8th March 11am to 1pm, Wed 9th March 11am to 1pm and then Sunday 13th March 2pm to 4pm. Basically lopping back the bigger branches that the brush cutter cannot cut.
Thanks to all who braved the weather today. Loads done.
See you on the next one.